Project

General

Profile

Actions

Release checklist

  • The offline suite passes on a device with the network disabled for the whole run.
  • A cold install can complete a job, upload a photo and collect a signature.
  • An upgrade from the previous release keeps a queued job.
  • Battery measurement over an hour with the job list open is within 3 % of the previous release.
  • Store metadata and screenshots match the build being submitted.
  • The release note in the news names every user-visible change.

Updated by Mara Oyelaran 6 months ago · 1 revisions

Also available in: PDF HTML TXT