| 1 | 1 | Mara Oyelaran | # Release process |
|---|---|---|---|
| 2 | |||
| 3 | Two-week cycles. The version is cut on a Tuesday, spends two days on staging with the replay suite |
||
| 4 | running against it, and goes to production on Thursday morning behind a flag that is opened to 5 %, |
||
| 5 | then 50 %, then everyone, over the following day. |
||
| 6 | |||
| 7 | A fix that must not wait for the cycle goes out as a patch release, which skips staging only if the |
||
| 8 | change is a single-line configuration value. Anything larger waits for the next morning window. |
||
| 9 | |||
| 10 | Rollback is a flag flip and takes under a minute, which is why every release must be able to run |
||
| 11 | against the previous schema. That constraint is the reason migrations are split into an additive |
||
| 12 | change now and a destructive change two releases later. |